New Connections

Your Utility Connection

Services

The New Connections Office assists with new utility meter and service line installations for gas, water, and wastewater service including:

  • Cost estimates
  • Meter installation
  • Meter relocation
  • Meter upgrade
  • New construction service
  • New utility service line
  • Utility service line extension
  • Utility service line relocation


Utility Connection Charges

  1. Gas Connection Charges
  2. Water Connection Charges
Effective December 1, 2020

CF Demand (up to...)Service Line (up to 50 feet)Service Line (over 50 feet)
Meter Charge
Total Charge
*250 cfh
$350.00
$4.80 per foot
$37.00
$387.00
400 cfh
$15.70 per foot
$305.00
Varies
675 cfh
$15.70 per foot
$1,030.00
Varies
1,000 cfh
$15.70 per foot
$1,340.00
Varies
1,500 cfh (1)
$15.70 per foot
$1,340.00
Varies
CF Demand (greater than...)Service Line (up to 50 feet)
Meter Charge
Total Charge
1,500 cfh$15.70 per foot
$3,550.00
Varies
Electro Corrector


$1,460.00
Unable To Connect Charge



$150.00
Pavement Cut




Up to 25 feet



$750.00
Over 25 feet



$30.00
per foot
Per Single Meter Manifold



$177.00
*Standard Service & Metering Fee - 3/4" Service Line and one 250 cfh meter
(1) Effective August 14, 2016