News Flash Home
The original item was published from 3/14/2023 2:58:52 PM to 3/26/2023 12:00:01 AM.

News Flash

Public Works News

Posted on: March 14, 2023

[ARCHIVED] Casa Linda Acres Reconstruction Public Input Meeting

Proposed Calle del Encanto

The City of Las Cruces Public Works Department/Engineering and Architecture will conduct a public input meeting regarding the Casa Linda Acres Reconstruction Project from 5:30 p.m. to 7 p.m. Thursday, March 23, 2023, in Room 2007 B and C at City Hall, 700 N. Main St.
 
The project will consist of reconstructing Calle de Encanto, Avenida Blanco, and a portion of Calle de Sol. Roadway improvements will include new pavement, the installation of new curbs and gutters, sidewalks, drive pads, ADA ramps, street lighting, and stormwater infrastructure.
 
Underground utility improvements will include the installation of new gas, water, and sewer lines. Mature trees within the parkways that have caused infrastructure issues in the past will be part of the design and discussion at the meeting.
 
For information, call the Public Works Department/Engineering and Architecture at 575/541-3135.

Facebook Twitter Email

Other News in Public Works News

Lane Closure (1)

South Telshor Boulevard Lane Closure

Posted on: December 4, 2023
Road Closed Sign

Bellamah Drive Road Closure

Posted on: November 27, 2023
Orange Cones

Roadrunner Parkway Lane Closure

Posted on: November 21, 2023
Road Closed Sign

Bellamah Drive Roadway Project

Posted on: August 29, 2023
Lane Closure (1)

Midway Avenue Reconstruction

Posted on: August 18, 2023
Road Closed Sign

Westway Avenue Closure

Posted on: November 2, 2022